Above Header

Request a Core Infrastructure Inspection, Site Acceptance Inspection and Final Inspection

The Core Infrastructure Inspection is required to verify roadways are stabilized, the stormwater management system is in place, and fire protection is provided in accordance with the County approved construction plans. The Core Infrastructure Inspection shall occur at a time when these conditions have been satisfied.

Instructions

For a Site Acceptance Inspection complete the Engineer's Certification of Construction Completion. Prior to the Final Inspection a signed and sealed letter from the Engineer of Record certifying that the infrastructure has remained in compliance during the entire twelve (12) month maintenance period.  Select the 'Request for Help' button to schedule a final inspection.

location_on
Location:

2401 SE Monterey Road Stuart, FL 34996

phone