Above Header

Environmental Inspection for Final Lake Littoral Vegetation

Prior to issuance of a Certificate of Occupancy for structures associated with commercial, multifamily, or residential subdivision development, a final environmental inspection may be required. This inspection may be to validate the status of plantings provided for lakes or landscaping, as certified by a qualified professional. 

Five (5) business days prior to requesting this inspection, the Developer needs to provide the Environmental Final Inspection packet. This packet must contain the following:

  • Certification of Completion for Installation of Plant Materials on the Landscape's Architect's letterhead.
  • The "As-built" landscape plan signed and sealed by the Landscape Architect.
  • Costs of Materials and Installation
  • Surety (having no expiration date) equal to a minimum of 50% of the total landscape costs.
  • Surety (having no expiration date) equal to a minimum of 110% of the total costs of the littoral vegetation.
  • Certification of the PAMP compliance by an environmental professional
     
Instructions

If you have questions or issues, please select the "Request for Help or More Information" button below.

location_on
Location:

2401 SE Monterey Road Stuart, FL 34996

phone