Search for any Martin County Board of County Commissioners Projects.

District

Status

Type

Search Martin County Projects

List

More Info.
More Info2024 St. Lucie Inlet Operation and Maintenance The navigation maintenance of the St. Lucie Inlet with material placement in off-shore borrow area B.In DesignCoastalDistrict 1
District 2
District 3
District 4
District 5
District 1, District 2, District 3, District 4, District 5
More InfoAutomatic Meter Read (AMR) Replacement3200 water meters are being replaced per year throughout the County.ConstructionUtilities, Water & SewerDistrict 1
District 2
District 3
District 4
District 5
District 1, District 2, District 3, District 4, District 5
More InfoCR-714 (SW Martin Highway) Resurfacing (SR-710 to Fox Brown Rd)The project includes milling and resurfacing between SR-710 (SW Warfield Boulevard) and SW Fox Brown Road. The 7.7-mile project also includes regrading of swales, removal and replacement of failing drainage pipes, and installing new pavement markings. This project is funded by the Florida Department of Transportation (FDOT) through the Small County Outreach Program (SCOP) and administered by Martin County Public Works Department.ConstructionRoadwaysDistrict 5District 5
More InfoCharlie Leighton Park Boat RampUpdate: Charlie Leighton Park Boat Ramp Updates – The design is complete. A FIND grant has been applied for with a match from the FY2025 CIP. Expected bid for construction is late Fall 2024.In DesignParksDistrict 5District 5
More InfoEvergreen/Windstone Water AssessmentProposed water main assessment to serve approximately 405 single family residential units.In DesignUtilities, Water & SewerDistrict 5District 5
More InfoHawks Hammock AccessHawks Hammock Preserve consists of 431 acres of primarily pine flatwoods and scattered wetlands. A pavilion has been constructed on the preserve in addition to a series of equestrian and hiking trails. The newly acquired access consists of 11 acres directly adjacent to SW Green Farms Lane then leads into the northwest corner of Hawks Hammock Preserve. The new parcel primarily falls under an existing Preserve Area Management Plan (PAMP) with a boundary trail system identified. Past efforts by the county to provide public access via an easement through Markel Street to the southeast had not been successful, due to landowner objections. The Ecosystem and Restoration division has identified the need to a provide a new equestrian/pedestrian access to Hawks Hammock Preserve off SW Green Farms Lane. The project will include trailer friendly turnaround, improved trail system to access Hawks Hammock, kiosk, small pavilion/ pole barn, exotic vegetation treatment, and boundary fencing.ConstructionEnvironmental & StormwaterDistrict 5District 5
More InfoHydrant ReplacementReplace older and obsolete fire hydrants as needed on an annual basis.ConstructionUtilities, Water & SewerDistrict 1
District 2
District 3
District 4
District 5
District 1, District 2, District 3, District 4, District 5
More InfoOld Palm City - Septic to Sewer Conversion Construction of vacuum sewer system to serve 1029 properties for S2S conversions. Construction water lines to serve approximately 395 properties.In DesignUtilities, Water & SewerDistrict 5District 5Old Palm City
More InfoOld Palm City North Neighborhood RestorationThe Infrastructure Reinvestment project includes the replacement of drainage structures, regrading of drainage swales, replacement of aging utilities, pavement milling, resurfacing, replacement of sidewalks, and other ancillary items within the neighborhood. This project completes the neighborhood restoration of the Maplewood, Gull Harbor, Pelican's Cove, Riverview, Stratford Downs, Woodside, Seagate Harbor, and Lighthouse Point subdivisions.In DesignNeighborhood RestorationDistrict 5District 5
More InfoPalm City Farms Stormwater Master PlanningThe purpose of this project is to develop a stormwater management master plan for the Palm City Farms area. A majority of the area falls within the FEMA Floodplain. As land use has changed, these systems may need to be re-evaluated for function, flood protection, and water quality, through a new stormwater management master plan. Several smaller projects that were identified as critical by this modeling effort have been completed since the start of the design. These projects include: - Repair of a historic berm in Western Danforth/Bessey Basins. - Replacement of an undersized culvert within Danforth Creek - Cleaning of box culverts in Danforth & Mapp Creek Basins - Roadside swale dredging & grading to improve drainage conveyance in sections of SW Citrus Blvd.In DesignEnvironmental & StormwaterDistrict 5District 5
More InfoPalm City Place & PatioThe community has prioritized this land for recreational access, with the water feature as the centerpiece. Palm City Place will provide nearby residents with opportunities to walk, picnic, fish, play, and enjoy the outdoors. There is broad public support for the proposed improvements and have been part of the Community Redevelopment Plan since 2003. Participants in the plan stated “The residents of Palm City would like to envision Mapp Road features to include a Town Square (by the Fire Station) type of feature for the community to gather”. This plaza like community gathering space will allow for potential events in the future as well as economic growth along the new Mapp Road streetscape. Elements of the project include: • A new picnic shade structure; • A freshwater fishing pier into stormwater treatment area • A path around the stormwater treatment area • Ping pong tables • Cornhole sets • Chess/checkers tables • Trash receptacle • Benches • A lighted fountain in stormwater treatment area • Electrical Lighting • Landscaping • Irrigation SystemConstructionCommunity Redevelopment Area (CRA)District 5District 5Old Palm City
More InfoPalm City StormwaterInstallation of backflow preventers in several locations throughout the County with an emphasis in Old Palm City. High water levels during tidal and storm events cause saltwater intrusion into the system, reducing storage by up to 6 acre/ft., impacting water quality and the freshwater aquatic community. Create natural velocity dissipating spillways eventually, along with necessary repairs/replacements to the existing system to fit the backflow preventers. These areas have been identified in a county-wide vulnerability study.In DesignEnvironmental & StormwaterDistrict 5District 5Old Palm City
More InfoRipple Stormwater EcoArt ProjectThe Ripple Stormwater Eco-Art Project is a water quality and eco-art project located on parcels along 28th Street and 29th Street in Old Palm City. The project design was developed through artist led community engagement with neighborhood residents and design professionals. Project design was partially funded through the National Endowment for the Arts, Our Town Grants. The project encompasses stormwater system improvements over four (4) Martin County owned parcels totaling approximately 2.36 acres, within a drainage basin of approximately 20 acres. The intent of the project is to provide water quality and flood routing improvements, along with educational installations and art features. The project consists of a trail system traversing through the four sites with each site utilizing either dry or wet detention ponds designed to provide water quality and flood attenuation improvements.CompletedCommunity Redevelopment Area (CRA)District 5District 5Old Palm City
More InfoSW High Meadow Avenue at SW Sunset Trail Intersection ImprovementsConstruction of a roundabout at SW High Meadow Avenue at SW Sunset Trail for intersection improvements including pedestrian and bicycle facilities.In DesignTrafficDistrict 5District 5
More InfoSW Mockingbird Lane Resilience ProjectSW Mockingbird Lane experiences repeated flooding during high tide events due to the low elevation of the roadway and adjacent drainage ditch.In DesignCoastalDistrict 5District 5
More InfoSanitary Sewer Lining and Manhole RepairProject to line existing sanitary sewers and restore manholes at strategic locations to reduce large amounts of infiltration and inflow (I/I). During heavy rainfall events, large amounts of spurious rainfall runoff infiltration the older portions of the County's sanitary sewer system. This project will be ongoing until infiltration and inflow (I/I) is reduced to an acceptable level.ConstructionUtilities, Water & SewerDistrict 1
District 2
District 3
District 4
District 5
District 1, District 2, District 3, District 4, District 5
More InfoSe Avalon Drive SidewalkA new six-foot wide sidewalk is proposed on the east side of SE Avalon Dr between SE Cove Road and SE Salerno Road in Stuart, Florida. The project will include open swale drainage that will be piped to accommodate improved drainage and roadside grading.In DesignSidewalksDistrict 4
District 5
District 4, District 5
More InfoState Road (SR) 714/SW Martin Highway from SW Citrus Blvd to SW Martin Downs Blvd.This project includes the following items: • Widening SR 714/SW Martin Highway from a two-lane undivided rural roadway to a four-lane divided urban roadway • Widening the bridge over Florida’s Turnpike • Constructing a seven-foot buffered bike lanes and six-foot sidewalks on both sides of the roadway • Realigning SW Leighton Farm Avenue further west to line up with SW Deggeller Court and creating a four-legged intersection • Installing a new closed-drainage system with a retention pond • Installing signing, signalization, and lighting upgradesConstructionRoadwaysDistrict 5District 5

Map

Martin County Projects Status

Help

If you search for a project and do not receive expected results or you have questions, please submit a request for service and provide details on the project.